﻿Network Working Group                                       K. Singh
Internet-Draft                                      Apex Infrastructure
Intended status: Informational                              11 May 2026
Expires: 12 November 2026




        PSI-01: Zero-Knowledge Method for Ventilation Air Methane 
           Destruction Verification under Safeguard Mechanism
                    draft-singh-psi-01-00




Abstract


   This document specifies PSI-01, a zero-knowledge method for proving
   Ventilation Air Methane (VAM) thermal destruction to satisfy
   Australia's Carbon Credits (Carbon Farming Initiative—Coal Mine 
   Waste Gas) Methodology Determination 2026, Clause 20A. 


Status of This Memo


   This Internet-Draft is submitted in full conformance with the
   provisions of BCP 78 and BCP 79.


   Internet-Drafts are working documents of the Internet Engineering
   Task Force (IETF).  Note that other groups may also distribute
   working documents as Internet-Drafts.  The list of current Internet-
   Drafts is at https://datatracker.ietf.org/drafts/current/.


   Internet-Drafts are draft documents valid for a maximum of six months
   and may be updated, replaced, or obsoleted by other documents at any
   time.  It is inappropriate to use Internet-Drafts as reference
   material or to cite them other than as "work in progress."


   This Internet-Draft will expire on 12 November 2026.


Copyright Notice


   Copyright (c) 2026 IETF Trust and the persons identified as the
   document authors.  All rights reserved.


   This document is subject to BCP 78 and the IETF Trust's Legal
   Provisions Relating to IETF Documents
   (https://trustee.ietf.org/license-info) in effect on the date of
   publication of this document.  Please review these documents
   carefully, as they describe your rights and restrictions with respect
   to this document.  Code Components extracted from this document must
   include Simplified BSD License text as described in Section 4.e of
   the Trust Legal Provisions and are provided without warranty as
   described in the Simplified BSD License.


1.  Introduction


   The Safeguard Mechanism requires coal mines to surrender ACCUs for
   fugitive VAM emissions.  PSI-01 defines a computational standard to 
   prove compliance without data disclosure.


2.  Conformance Requirements


   A facility conforms to PSI-01 if it produces a valid ZK-SNARK proof
   attesting: avg_temp > 1000 AND duration > 0.5s.  Proof anchored to 
   Bitcoin block header.


3.  Security Considerations


   The use of zero-knowledge proofs ensures that high-fidelity sensor
   telemetry remains private while providing cryptographic certainty 
   of the destruction event to the regulator.


4.  IANA Considerations


   This document has no IANA actions.


5.  Intellectual Property Rights


   Specification under Apache-2.0 with trademark exclusion. Reference 
   verifiers free under MIT. Commercial implementations exceeding 
   1,000 proofs per year MUST execute a method-licence deed with 
   Rockyfilms888 Pty Ltd. Royalty: AUD $0.30 per proof. 
   Contact: legal@apex-infrastructure.com


6.  Informative References


   [CER2026]  Clean Energy Regulator, "Carbon Credits (Carbon Farming
              Initiative-Coal Mine Waste Gas) Methodology Determination
              2026", 2026.


Author's Address


   Kawaljeet Singh
   Apex Infrastructure
   Melbourne, Australia
   Email: apexinfrastructure369@gmail.com