SIDR Operations                                                    Y. Li
Internet-Draft                                                    H. Zou
Intended status: Standards Track                                  G. Xie
Expires: 8 January 2026                                        CNIC, CAS
                                                             7 July 2025


                 Matching-first Route Origin Validation
                    draft-li-sidrops-matching-rov-00

Abstract

   Route Origin Validation (ROV) using the Resource Public Key
   Infrastructure (RPKI) enables BGP routers to identify illegitimate
   routes that violate Route Origin Authorizations (ROAs).  However,
   widespread deployment of RPKI requires validation systems to process
   high volumes of route announcements against increasingly large ROA
   datasets, where ROV adoption faces significant barriers due to
   concerns about its processing efficiency.  This document identifies a
   performance issue inherent in current ROV procedure, which could be
   exacerbated as the expanding coverage of ROAs.

Status of This Memo

   This Internet-Draft is submitted in full conformance with the
   provisions of BCP 78 and BCP 79.

   Internet-Drafts are working documents of the Internet Engineering
   Task Force (IETF).  Note that other groups may also distribute
   working documents as Internet-Drafts.  The list of current Internet-
   Drafts is at https://datatracker.ietf.org/drafts/current/.

   Internet-Drafts are draft documents valid for a maximum of six months
   and may be updated, replaced, or obsoleted by other documents at any
   time.  It is inappropriate to use Internet-Drafts as reference
   material or to cite them other than as "work in progress."

   This Internet-Draft will expire on 8 January 2026.

Copyright Notice

   Copyright (c) 2025 IETF Trust and the persons identified as the
   document authors.  All rights reserved.

   This document is subject to BCP 78 and the IETF Trust's Legal
   Provisions Relating to IETF Documents (https://trustee.ietf.org/
   license-info) in effect on the date of publication of this document.
   Please review these documents carefully, as they describe your rights



Li, et al.               Expires 8 January 2026                 [Page 1]

Internet-Draft                   MF-ROV                        July 2025


   and restrictions with respect to this document.  Code Components
   extracted from this document must include Revised BSD License text as
   described in Section 4.e of the Trust Legal Provisions and are
   provided without warranty as described in the Revised BSD License.

Table of Contents

   1.  Introduction  . . . . . . . . . . . . . . . . . . . . . . . .   2
     1.1.  Requirements Language . . . . . . . . . . . . . . . . . .   3
     1.2.  Terminology . . . . . . . . . . . . . . . . . . . . . . .   3
   2.  Overview of Current ROV Procedure . . . . . . . . . . . . . .   3
   3.  Performance Issue Analysis and Evaluation . . . . . . . . . .   4
     3.1.  Comparative Validation Latency Impact by Validity
           Distribution  . . . . . . . . . . . . . . . . . . . . . .   4
     3.2.  Temporal Dynamics in ROV Efficiency . . . . . . . . . . .   9
     3.3.  A Brief Summary . . . . . . . . . . . . . . . . . . . . .  12
   4.  Matching First Route Origin Validation  . . . . . . . . . . .  12
     4.1.  Another Reference Implementation  . . . . . . . . . . . .  13
     4.2.  Lessons Lenard from Reference Implementations . . . . . .  14
   5.  Security Considerations . . . . . . . . . . . . . . . . . . .  15
   6.  IANA Considerations . . . . . . . . . . . . . . . . . . . . .  15
   7.  References  . . . . . . . . . . . . . . . . . . . . . . . . .  15
     7.1.  Normative References  . . . . . . . . . . . . . . . . . .  15
     7.2.  Informative References  . . . . . . . . . . . . . . . . .  15
   Authors' Addresses  . . . . . . . . . . . . . . . . . . . . . . .  15

1.  Introduction

   The rapid deployment of RPKI has significantly expanded Route Origin
   Authorization (ROA) coverage.  However, validating large volumes of
   route announcements against increasingly massive ROA datasets poses a
   significant challenge for routers.  These efficiency concerns
   regarding Route Origin Validation (ROV) create a barrier to its wider
   adoption.

   Current ROV implementations, defined in RFCs 6483 and 6811, typically
   perform an initial coarse-grained match of a BGP route against all
   ROAs before verifying an exact match.  This approach optimizes for
   routes without ROA coverage, allowing their validity state (e.g.,
   NotFound) to be determined quickly.  However, as ROA coverage
   expands, this method suffers performance degradation: validation
   latency increases proportionally with the expanding ROA datasets,
   especially the increasing number of BGP routes that can pass the
   validation.  Evaluations of open-source ROV implementations confirm
   this scaling issue.






Li, et al.               Expires 8 January 2026                 [Page 2]

Internet-Draft                   MF-ROV                        July 2025


   To mitigate performance degradation caused by shifting validity
   distributions, this document defines a modified validation model
   through step reordering.  The optimized workflow first performs
   precise matching against all ROAs to immediately identify Valid
   routes, followed by coverage verification to determine NotFound
   status.  Performance evaluations of reference implementations confirm
   the model's superiority.

1.1.  Requirements Language

   In this document, the key words "MUST", "MUST NOT", "REQUIRED",
   "SHALL", "SHALL NOT", "SHOULD", "SHOULD NOT", "RECOMMENDED", "MAY",
   and "OPTIONAL" are to be interpreted as described in RFC 2119
   [RFC2119] when they appear in all upper case.

1.2.  Terminology

   Besides, the terms "VRP", "VRP Prefix", "VRP ASN", "Route", "Route
   Prefix", "Route Origin ASN", "Covered", "Matched", "NotFound",
   "Valid", "Invalid" are to be interpreted as described in RFC 6811
   [RFC6811] when they appear in all upper case.

   If a Route is Covered by a VRP, it is termed a covering VRP of that
   Route.  Similarly, if a Route is Matched by a VRP, it is termed a
   matching VRP of that Route.  For a given Route, a matching VRP is a
   special covering VRP such that: 1) its VRP ASN is the same as the
   Route Origin ASN and 2) its maxLength value is greater than or equal
   to the length of Route Prefix.

   For a given Route, the process of finding out a covering VRP or
   figuring out whether there exists a covering VRP is termed *FC*,
   while the process of finding out a matching VRP or figuring out
   whether there exists a matching VRP is termed *FM*. The process to
   examine whether a covering VRP is a matching VRP is termed *EM*.

2.  Overview of Current ROV Procedure

   As a informational, RFC 6483 [RFC6483] describes a general procedure
   to determine the validity state of a given Route against a set of
   VRPs, which can be summarized as follows using the terms FC and EM.

   *  FC step: iteratively perform FC to find out all covering VRPs,
      output NotFound if there is no covering VRP; otherwise go to the
      EM step.

   *  EM step: iteratively perform EM to examine every covering VRP,
      output Invalid if there is no matching VRP; otherwise output Valid
      once a matching VRP is found.



Li, et al.               Expires 8 January 2026                 [Page 3]

Internet-Draft                   MF-ROV                        July 2025


   RFC 6811 [RFC6811] has standardized the validation procedure and
   provides the corresponding pseudo-code, which illustrates a similar
   procedure as the above one but could be more efficient regarding
   system implementation.  This validation procedure can be summarized
   as follows using the terms FC and EM.

   *  FC step: perform FC to find out the first covering VRP, output
      NotFound if this step fails; otherwise go to the EM step.

   *  EM step: iteratively perform EM to examine the current covering
      VRP and perform FC to find out the next covering VRP, output
      Invalid if there is no matching VRP; otherwise output Valid once a
      matching VRP is found.

   Actually, the ROV implementations with the RTRLib [RTRLib], BIRD
   [BIRD] and BGP-SRX [BGP-SRX] all follow the above validation
   procedure.  They all adopt Trie-like structures for FC and can output
   NotFound fast at the earliest stage.  We call this validation
   procedure the *non-covering* first validation.

3.  Performance Issue Analysis and Evaluation

   Non-covering first validation optimizes for BGP routes in the
   NotFound state.  However, this approach delays determining the
   validity state of Valid routes, which was a tolerable tradeoff during
   early RPKI deployment when sparse ROA coverage resulted in
   predominantly NotFound states.  However, today, with more than half
   of global BGP routes are in the Valid state (and growing), non-
   covering first validation incurs escalating latency as both ROA
   volume and Valid routes increase simultaneously.

   To quantify this scaling limitation, we measured ROV efficiency using
   real-world ROA datasets and BGP routing tables.  We evaluated four
   implementations: RTRLib, BGP-SRX, BIRD's basic ROV (BIRD-basic), and
   BIRD's Trie-optimized ROV (BIRD-opt).  The mean validation latency
   per route during full-table processing served as the efficiency
   metric.  Related source code, datasets and results can be accessed
   via: https://github.com/FIRLab-CNIC/h-2ROV

3.1.  Comparative Validation Latency Impact by Validity Distribution

   Validation of the full RIB (collected from RIPE NCC RIS RRC00
   collector on 1st July, 2025) against ROAs (collected from RIPE NCC on
   1st July, 2025) classifies routes into three subsets: Valid, Invalid,
   and NotFound.  Using these subsets, we synthesized 55 test RIBs of
   fixed size (1,050,986 routes each) with controlled validity
   distributions.  Each test RIB was constructed by randomly sampling
   specified quantities of routes from the Valid, Invalid, and NotFound



Li, et al.               Expires 8 January 2026                 [Page 4]

Internet-Draft                   MF-ROV                        July 2025


   subsets.  The four ROV mechanisms preloaded with the collected ROAs
   were evaluated against all 55 synthetic RIBs, with results detailed
   below.

   Experimental results confirm an inverse correlation between the
   proportion of Valid routes and validation efficiency in RTRLib, BGP-
   SRX, and BIRD-opt when the sum of routes in Valid or NotFound states
   is held constant.  In tests with no Invalid routes, increasing the
   Valid ratio from 0 to 100% in 10% increments induced latency
   multipliers of 1.6, 1.9, and 3.5 for the respective implementations.
   With 10% of routes in Invalid state, the latency multipliers become
   1.5, 1.8, and 3.1 under identical conditions.  The root inefficiency
   stems from how non-covering first validation defers validation of
   Valid routes, where the latency penalty compounds as the proportion
   of Valid routes increases.

   Contrasting with other implementations, BIRD-basic exhibits an
   inverse performance relationship: mean validation latency decreases
   with higher Valid route proportions.  This anomaly stems from its
   structural divergence from true non-covering first validation.
   Without Trie optimization, BIRD-basic employs iterative hash probes
   to identify covering VRPs and cannot output NotFound until all probes
   complete.  This design causes severe inefficiency in NotFound-
   dominant environments.  This is the reason why BIRD-opt was
   developed.  However, as Valid routes become prevalent, the way using
   iterative hash probes show its advantage since many Valid routes
   could be confirmed within few probes.  Experimental results show
   BIRD-basic outperforming BIRD-opt in pure-Valid scenarios.  Thus,
   BIRD-basic accidentally approximates (though inefficiently) the
   validation model proposed in Section 4.

   *The Validation Latency with RTRLib (nanosecond):*



















Li, et al.               Expires 8 January 2026                 [Page 5]

Internet-Draft                   MF-ROV                        July 2025


   +============+====+====+====+====+====+====+====+====+====+====+====+
   | % of       |0%  |10% |20% |30% |40% |50% |60% |70% |80% |90% |100%|
   | Valid      |    |    |    |    |    |    |    |    |    |    |    |
   +============+====+====+====+====+====+====+====+====+====+====+====+
   | % of       |    |    |    |    |    |    |    |    |    |    |    |
   | NotFound   |    |    |    |    |    |    |    |    |    |    |    |
   +------------+----+----+----+----+----+----+----+----+----+----+----+
   | 0%         |1190|1214|1241|1266|1282|1306|1351|1359|1376|1406|1464|
   +------------+----+----+----+----+----+----+----+----+----+----+----+
   | 10%        |1173|1192|1215|1237|1361|1280|1321|1346|1476|1399|    |
   +------------+----+----+----+----+----+----+----+----+----+----+----+
   | 20%        |1147|1170|1194|1221|1232|1254|1281|1315|1321|    |    |
   +------------+----+----+----+----+----+----+----+----+----+----+----+
   | 30%        |1123|1148|1170|1195|1206|1245|1268|1351|    |    |    |
   +------------+----+----+----+----+----+----+----+----+----+----+----+
   | 40%        |1092|1119|1141|1237|1189|1218|1238|    |    |    |    |
   +------------+----+----+----+----+----+----+----+----+----+----+----+
   | 50%        |1072|1095|1119|1144|1165|1184|    |    |    |    |    |
   +------------+----+----+----+----+----+----+----+----+----+----+----+
   | 60%        |1047|1069|1092|1117|1137|    |    |    |    |    |    |
   +------------+----+----+----+----+----+----+----+----+----+----+----+
   | 70%        |1018|1048|1062|1092|    |    |    |    |    |    |    |
   +------------+----+----+----+----+----+----+----+----+----+----+----+
   | 80%        |996 |1020|1038|    |    |    |    |    |    |    |    |
   +------------+----+----+----+----+----+----+----+----+----+----+----+
   | 90%        |962 |984 |    |    |    |    |    |    |    |    |    |
   +------------+----+----+----+----+----+----+----+----+----+----+----+
   | 100%       |929 |    |    |    |    |    |    |    |    |    |    |
   +------------+----+----+----+----+----+----+----+----+----+----+----+

                                  Table 1

   *The Validation Latency with BGP-SRX (nanosecond):*


















Li, et al.               Expires 8 January 2026                 [Page 6]

Internet-Draft                   MF-ROV                        July 2025


   +==========+===+===+===+===+===+===+===+======+======+======+======+
   | % of     |0% |10%|20%|30%|40%|50%|60%| 70%  | 80%  | 90%  | 100% |
   | Valid    |   |   |   |   |   |   |   |      |      |      |      |
   +==========+===+===+===+===+===+===+===+======+======+======+======+
   | % of     |   |   |   |   |   |   |   |      |      |      |      |
   | NotFound |   |   |   |   |   |   |   |      |      |      |      |
   +----------+---+---+---+---+---+---+---+------+------+------+------+
   | 0%       |580|650|703|761|817|872|946| 994  | 1022 | 1115 | 1138 |
   +----------+---+---+---+---+---+---+---+------+------+------+------+
   | 10%      |597|653|701|765|804|859|947| 1007 | 1054 | 1115 |      |
   +----------+---+---+---+---+---+---+---+------+------+------+------+
   | 20%      |605|650|706|760|813|865|951| 1002 | 1019 |      |      |
   +----------+---+---+---+---+---+---+---+------+------+------+------+
   | 30%      |601|653|706|765|809|892|945| 974  |      |      |      |
   +----------+---+---+---+---+---+---+---+------+------+------+------+
   | 40%      |606|655|725|770|840|877|941|      |      |      |      |
   +----------+---+---+---+---+---+---+---+------+------+------+------+
   | 50%      |609|664|719|767|835|872|   |      |      |      |      |
   +----------+---+---+---+---+---+---+---+------+------+------+------+
   | 60%      |614|659|715|775|823|   |   |      |      |      |      |
   +----------+---+---+---+---+---+---+---+------+------+------+------+
   | 70%      |616|668|720|771|   |   |   |      |      |      |      |
   +----------+---+---+---+---+---+---+---+------+------+------+------+
   | 80%      |617|667|724|   |   |   |   |      |      |      |      |
   +----------+---+---+---+---+---+---+---+------+------+------+------+
   | 90%      |621|669|   |   |   |   |   |      |      |      |      |
   +----------+---+---+---+---+---+---+---+------+------+------+------+
   | 100%     |616|   |   |   |   |   |   |      |      |      |      |
   +----------+---+---+---+---+---+---+---+------+------+------+------+

                                 Table 2

   *The Validation Latency with BIRD-opt (nanosecond):*


















Li, et al.               Expires 8 January 2026                 [Page 7]

Internet-Draft                   MF-ROV                        July 2025


   +============+===+===+===+===+===+===+=====+=====+=====+=====+======+
   | % of       |0% |10%|20%|30%|40%|50%| 60% | 70% | 80% | 90% | 100% |
   | Valid      |   |   |   |   |   |   |     |     |     |     |      |
   +============+===+===+===+===+===+===+=====+=====+=====+=====+======+
   | % of       |   |   |   |   |   |   |     |     |     |     |      |
   | NotFound   |   |   |   |   |   |   |     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 0%         |442|458|474|494|508|522| 534 | 564 | 564 | 616 | 591  |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 10%        |420|439|449|466|475|496| 524 | 557 | 569 | 589 |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 20%        |392|416|421|439|450|466| 511 | 519 | 502 |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 30%        |366|381|411|410|419|449| 513 | 464 |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 40%        |337|353|372|398|405|411| 435 |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 50%        |309|323|343|353|385|382|     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 60%        |279|296|310|327|362|   |     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 70%        |253|270|299|296|   |   |     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 80%        |225|240|254|   |   |   |     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 90%        |198|220|   |   |   |   |     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 100%       |168|   |   |   |   |   |     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+

                                  Table 3

   *The Validation Latency with BIRD-basic (nanosecond):*


















Li, et al.               Expires 8 January 2026                 [Page 8]

Internet-Draft                   MF-ROV                        July 2025


   +==========+====+====+====+====+====+====+======+===+===+===+======+
   | % of     |0%  |10% |20% |30% |40% |50% | 60%  |70%|80%|90%| 100% |
   | Valid    |    |    |    |    |    |    |      |   |   |   |      |
   +==========+====+====+====+====+====+====+======+===+===+===+======+
   | % of     |    |    |    |    |    |    |      |   |   |   |      |
   | NotFound |    |    |    |    |    |    |      |   |   |   |      |
   +----------+----+----+----+----+----+----+------+---+---+---+------+
   | 0%       |1457|1358|1259|1169|1076|995 | 882  |800|699|602| 508  |
   +----------+----+----+----+----+----+----+------+---+---+---+------+
   | 10%      |1501|1418|1314|1215|1123|1031| 947  |859|757|685|      |
   +----------+----+----+----+----+----+----+------+---+---+---+------+
   | 20%      |1542|1456|1354|1273|1171|1080| 980  |916|793|   |      |
   +----------+----+----+----+----+----+----+------+---+---+---+------+
   | 30%      |1594|1502|1437|1329|1219|1150| 1068 |931|   |   |      |
   +----------+----+----+----+----+----+----+------+---+---+---+------+
   | 40%      |1646|1559|1494|1423|1295|1224| 1101 |   |   |   |      |
   +----------+----+----+----+----+----+----+------+---+---+---+------+
   | 50%      |1681|1592|1513|1410|1351|1226|      |   |   |   |      |
   +----------+----+----+----+----+----+----+------+---+---+---+------+
   | 60%      |1757|1637|1553|1458|1399|    |      |   |   |   |      |
   +----------+----+----+----+----+----+----+------+---+---+---+------+
   | 70%      |1777|1735|1634|1513|    |    |      |   |   |   |      |
   +----------+----+----+----+----+----+----+------+---+---+---+------+
   | 80%      |1842|1742|1647|    |    |    |      |   |   |   |      |
   +----------+----+----+----+----+----+----+------+---+---+---+------+
   | 90%      |1931|1853|    |    |    |    |      |   |   |   |      |
   +----------+----+----+----+----+----+----+------+---+---+---+------+
   | 100%     |1969|    |    |    |    |    |      |   |   |   |      |
   +----------+----+----+----+----+----+----+------+---+---+---+------+

                                 Table 4

3.2.  Temporal Dynamics in ROV Efficiency

   To evaluate ROV efficiency over time, quarterly snapshots of RIBs and
   ROAs were collected from January 2015 to July 2025 (January 1, April
   1, July 1, and October 1 annually).  These form 43 paired datasets,
   each containing a RIB and ROAs collected on the same date.  Every
   dataset was evaluated by validating all routes in its RIB against
   corresponding ROAs using the four ROV mechanisms respectively, with
   results detailed below.

   *The Validation Latency with Five ROV Implementations (nanosecond):*








Li, et al.               Expires 8 January 2026                 [Page 9]

Internet-Draft                   MF-ROV                        July 2025


    +==========+=========+==========+============+==========+=========+
    |          | h-ROV   | RTRLib   | BIRD-basic | BIRD-opt | BGP-SRX |
    +==========+=========+==========+============+==========+=========+
    | 20150101 | 165.098 | 523.560  | 757.002    | 118.413  | 175.254 |
    +----------+---------+----------+------------+----------+---------+
    | 20150401 | 158.655 | 491.642  | 791.139    | 115.407  | 178.476 |
    +----------+---------+----------+------------+----------+---------+
    | 20150701 | 155.087 | 497.265  | 827.130    | 113.161  | 180.930 |
    +----------+---------+----------+------------+----------+---------+
    | 20151001 | 154.083 | 497.265  | 834.028    | 113.122  | 182.548 |
    +----------+---------+----------+------------+----------+---------+
    | 20160101 | 163.399 | 503.778  | 863.558    | 113.804  | 185.322 |
    +----------+---------+----------+------------+----------+---------+
    | 20160401 | 149.410 | 504.032  | 689.180    | 113.623  | 184.570 |
    +----------+---------+----------+------------+----------+---------+
    | 20160701 | 165.920 | 514.139  | 738.007    | 114.837  | 188.005 |
    +----------+---------+----------+------------+----------+---------+
    | 20161001 | 146.649 | 517.331  | 744.602    | 115.580  | 189.179 |
    +----------+---------+----------+------------+----------+---------+
    | 20170101 | 147.189 | 519.751  | 755.858    | 116.618  | 192.976 |
    +----------+---------+----------+------------+----------+---------+
    | 20170401 | 151.378 | 528.262  | 791.766    | 117.495  | 195.810 |
    +----------+---------+----------+------------+----------+---------+
    | 20170701 | 155.063 | 531.632  | 819.672    | 119.775  | 201.450 |
    +----------+---------+----------+------------+----------+---------+
    | 20171001 | 158.403 | 542.005  | 884.956    | 121.907  | 204.583 |
    +----------+---------+----------+------------+----------+---------+
    | 20180101 | 161.316 | 541.712  | 924.214    | 123.305  | 212.811 |
    +----------+---------+----------+------------+----------+---------+
    | 20180401 | 171.438 | 553.403  | 732.601    | 125.109  | 216.967 |
    +----------+---------+----------+------------+----------+---------+
    | 20180701 | 154.154 | 634.921  | 823.723    | 143.740  | 264.971 |
    +----------+---------+----------+------------+----------+---------+
    | 20181001 | 159.668 | 648.508  | 838.926    | 145.879  | 273.973 |
    +----------+---------+----------+------------+----------+---------+
    | 20190101 | 154.967 | 668.003  | 923.361    | 154.727  | 298.063 |
    +----------+---------+----------+------------+----------+---------+
    | 20190401 | 164.123 | 684.463  | 759.301    | 160.436  | 314.367 |
    +----------+---------+----------+------------+----------+---------+
    | 20190701 | 174.307 | 699.790  | 759.301    | 164.177  | 328.192 |
    +----------+---------+----------+------------+----------+---------+
    | 20191001 | 158.957 | 722.543  | 872.600    | 174.917  | 353.982 |
    +----------+---------+----------+------------+----------+---------+
    | 20200101 | 178.987 | 742.390  | 985.222    | 185.632  | 371.609 |
    +----------+---------+----------+------------+----------+---------+
    | 20200401 | 173.370 | 771.010  | 1025.641   | 195.313  | 405.186 |
    +----------+---------+----------+------------+----------+---------+
    | 20200701 | 179.340 | 800.000  | 827.815    | 210.793  | 448.029 |



Li, et al.               Expires 8 January 2026                [Page 10]

Internet-Draft                   MF-ROV                        July 2025


    +----------+---------+----------+------------+----------+---------+
    | 20201001 | 188.076 | 835.422  | 912.409    | 228.102  | 490.677 |
    +----------+---------+----------+------------+----------+---------+
    | 20210101 | 205.719 | 865.801  | 989.120    | 244.141  | 529.661 |
    +----------+---------+----------+------------+----------+---------+
    | 20210401 | 194.970 | 882.613  | 1109.878   | 254.582  | 559.284 |
    +----------+---------+----------+------------+----------+---------+
    | 20210701 | 205.592 | 906.618  | 1273.885   | 265.816  | 575.705 |
    +----------+---------+----------+------------+----------+---------+
    | 20211001 | 198.570 | 883.392  | 1140.251   | 242.307  | 544.959 |
    +----------+---------+----------+------------+----------+---------+
    | 20220101 | 206.313 | 930.233  | 1406.470   | 271.370  | 592.417 |
    +----------+---------+----------+------------+----------+---------+
    | 20220401 | 210.881 | 962.464  | 1034.126   | 285.225  | 651.466 |
    +----------+---------+----------+------------+----------+---------+
    | 20220701 | 211.685 | 982.318  | 1046.025   | 298.954  | 678.887 |
    +----------+---------+----------+------------+----------+---------+
    | 20221001 | 212.811 | 1005.025 | 1101.322   | 314.169  | 707.714 |
    +----------+---------+----------+------------+----------+---------+
    | 20230101 | 216.263 | 1000.000 | 1187.648   | 303.767  | 679.348 |
    +----------+---------+----------+------------+----------+---------+
    | 20230401 | 223.115 | 1034.126 | 1254.705   | 328.947  | 695.894 |
    +----------+---------+----------+------------+----------+---------+
    | 20230701 | 225.785 | 1039.501 | 1245.330   | 329.056  | 767.460 |
    +----------+---------+----------+------------+----------+---------+
    | 20231001 | 255.754 | 1062.699 | 1333.333   | 355.999  | 775.795 |
    +----------+---------+----------+------------+----------+---------+
    | 20240101 | 257.533 | 1079.914 | 1362.398   | 370.096  | 795.545 |
    +----------+---------+----------+------------+----------+---------+
    | 20240401 | 239.292 | 1062.699 | 1443.001   | 350.140  | 747.384 |
    +----------+---------+----------+------------+----------+---------+
    | 20240701 | 244.618 | 1104.972 | 1631.321   | 383.877  | 823.045 |
    +----------+---------+----------+------------+----------+---------+
    | 20241001 | 246.488 | 1097.695 | 1510.574   | 376.506  | 794.913 |
    +----------+---------+----------+------------+----------+---------+
    | 20250101 | 246.488 | 1106.195 | 1555.210   | 385.654  | 859.845 |
    +----------+---------+----------+------------+----------+---------+
    | 20250401 | 255.493 | 1156.069 | 1049.318   | 397.298  | 884.173 |
    +----------+---------+----------+------------+----------+---------+
    | 20250701 | 254.001 | 1173.709 | 1089.325   | 409.668  | 892.857 |
    +----------+---------+----------+------------+----------+---------+

                                  Table 5

   Over time, Valid route prevalence increases significantly, with
   particularly rapid growth after 2019.  This correlates with a
   proportional decline in NotFound states.  Meanwhile, Invalid routes
   remain stable below 3.0%, exhibiting minor fluctuations.



Li, et al.               Expires 8 January 2026                [Page 11]

Internet-Draft                   MF-ROV                        July 2025


   Consequently, ROV efficiency becomes predominantly governed by the
   latency performance for either Valid or NotFound route processing.
   Concurrently, expanding ROA datasets can also compound ROV
   computational demands.

   Expanding ROA datasets and rising Valid route prevalence collectively
   drive significant latency growth in RTRLib, BGP-SRX, and BIRD-opt,
   which have increased by factors of 1.6, 2.4, and 2.2, respectively
   since 2020.  However, BIRD-basic, while consistently outperformed by
   its Trie-optimized variant (BIRD-opt) throughout the observation
   period, exhibits marginal throughput gains since April 2025.  This
   confirms that validity distribution has become the dominant factor to
   ROV efficiency of BIRD-basic.

3.3.  A Brief Summary

   *  While non-covering first validation provided efficiency advantages
      during RPKI's initial deployment phase, it has become unsuitable
      for present-day validity distributions and will exhibit
      progressively worse scalability as RPKI adoption continues to
      grow.

   *  As RPKI adoption increases, two distinct factors, expanding ROA
      datasets and rising Valid route prevalence, independently yet
      collectively impact ROV efficiency.  These separable influences
      warrant distinct optimization strategies.

4.  Matching First Route Origin Validation

   Non-covering first validation, though pivotal during initial RPKI
   deployment, fails to scale in modern environments where Valid routes
   have exceed 50% and continue growing, rendering it fundamentally
   mismatched to current validity distributions and those in future.
   Revisiting the validation model is now imperative to guide ROV
   implementations toward capitalizing on rising Valid route prevalence
   while mitigating scaling challenges from expanding ROA datasets.  The
   critical optimization involves prioritizing matching VRP discovery
   over covering VRP searches.  Such a matching first validation
   procedure can be defined as follows.

   *  FM step: find out a matching VRP or figuring out whether there
      exists a matching VRP, output Valid if there is one; otherwise go
      to the FC step.

   *  FC step: find out a covering VRP or figuring out whether there
      exists a covering VRP, output Invalid if there is one; otherwise
      output NotFound.




Li, et al.               Expires 8 January 2026                [Page 12]

Internet-Draft                   MF-ROV                        July 2025


4.1.  Another Reference Implementation

   BIRD-basic constitutes an implementation of this model, thus
   benefiting significantly from rising Valid route proportions.
   However, its efficiency remains suboptimal due to requiring multiple
   hash probes, each involving sequential FM examinations, to confirm
   Valid state.  In contrast, h-ROV [h-ROV] provides a more efficient
   reference implementation through bitmap-encoded VRPs.  This approach
   guarantees most Valid routes are identified via a single hash probe
   followed with a bitwise operation.

   Experimental results (detailed below) for h-ROV, evaluated per the
   methodology described in Section 3.1, demonstrate 66.3%~85.7% lower
   validation latency than BIRD-basic under identical validity
   distributions.  When Valid routes exceed 30%, h-ROV achieves the
   lowest latency among all evaluated ROV mechanisms.

   *The Validation Latency with h-ROV (nanosecond):*

































Li, et al.               Expires 8 January 2026                [Page 13]

Internet-Draft                   MF-ROV                        July 2025


   +============+===+===+===+===+===+===+=====+=====+=====+=====+======+
   | % of       |0% |10%|20%|30%|40%|50%| 60% | 70% | 80% | 90% | 100% |
   | Valid      |   |   |   |   |   |   |     |     |     |     |      |
   +============+===+===+===+===+===+===+=====+=====+=====+=====+======+
   | % of       |   |   |   |   |   |   |     |     |     |     |      |
   | NotFound   |   |   |   |   |   |   |     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 0%         |209|207|204|199|195|192| 187 | 186 | 192 | 174 | 171  |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 10%        |218|217|213|211|205|202| 200 | 197 | 192 | 189 |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 20%        |228|225|222|220|215|211| 206 | 206 | 199 |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 30%        |236|236|235|229|222|223| 218 | 199 |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 40%        |246|245|242|220|234|232| 227 |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 50%        |255|251|251|247|245|239|     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 60%        |265|263|257|257|253|   |     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 70%        |276|271|266|266|   |   |     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 80%        |283|281|276|   |   |   |     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 90%        |294|293|   |   |   |   |     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+
   | 100%       |298|   |   |   |   |   |     |     |     |     |      |
   +------------+---+---+---+---+---+---+-----+-----+-----+-----+------+

                                  Table 6

   Experimental results for h-ROV (methodology per Section 3.2) show
   latency escalation consistent with other implementations due to
   expanding ROA datasets.  However, h-ROV exhibits more moderate
   latency growth, offset by efficiency gains from rising Valid route
   prevalence.  While BIRD-opt demonstrated the lowest latency before
   July 2019, h-ROV became the most efficient implementation after
   October 2019, with its performance advantage widening over time.

4.2.  Lessons Lenard from Reference Implementations

   *  While the matching-first validation model enables scalable
      performance amid expanding ROA coverage, realized ROV efficiency
      remains contingent on implementation-specific optimizations.

   *  Prefix-level VRP management enables highly efficient
      implementations of the matching first validation model.



Li, et al.               Expires 8 January 2026                [Page 14]

Internet-Draft                   MF-ROV                        July 2025


5.  Security Considerations

   The security considerations in Section 6 of RFC6811 [RFC6811] are
   also applied to this document.

6.  IANA Considerations

   This document has no IANA actions.

7.  References

7.1.  Normative References

   [RFC2119]  Bradner, S., "Key words for use in RFCs to Indicate
              Requirement Levels", BCP 14, RFC 2119,
              DOI 10.17487/RFC2119, March 1997,
              <https://www.rfc-editor.org/rfc/rfc2119>.

7.2.  Informative References

   [BGP-SRX]  NIST, "BGP Secure Routing Extension (BGP-SRx) Software
              Suite", Web https://github.com/usnistgov/NIST-BGP-SRx,
              2022.

   [BIRD]     CZ.NIC, "The BIRD Internet Routing Daemon",
              Web https://bird.network.cz/, 2023.

   [h-ROV]    ZD Ni, "From Address Blocks to Authorized Prefixes
              Redesigning RPKI ROV with a Hierarchical Hashing Scheme
              for Fast and Memory-Efficient Validation", 2025,
              <https://www.usenix.org/system/files/nsdi25-ni.pdf>.

   [RFC6483]  Huston, G. and G. Michaelson, "Validation of Route
              Origination Using the Resource Certificate Public Key
              Infrastructure (PKI) and Route Origin Authorizations
              (ROAs)", RFC 6483, DOI 10.17487/RFC6483, February 2012,
              <https://www.rfc-editor.org/rfc/rfc6483>.

   [RFC6811]  Mohapatra, P., Scudder, J., Ward, D., Bush, R., and R.
              Austein, "BGP Prefix Origin Validation", RFC 6811,
              DOI 10.17487/RFC6811, January 2013,
              <https://www.rfc-editor.org/rfc/rfc6811>.

   [RTRLib]   NIST ANTD, "RTRlib. The RPKI RTR Client C Library.",
              Web https://rtrlib.realmv6.org/, 2023.

Authors' Addresses




Li, et al.               Expires 8 January 2026                [Page 15]

Internet-Draft                   MF-ROV                        July 2025


   Yanbiao Li
   CNIC, CAS
   Email: lybmath@cnic.cn


   Hui Zou
   CNIC, CAS
   Email: zouhui@cnic.cn


   Gaogang Xie
   CNIC, CAS
   Email: xie@cnic.cn






































Li, et al.               Expires 8 January 2026                [Page 16]